Hot recycling of asphalt pavement (FHWA-OK-82-4) 405
| dc.contributor.sponsor | Oklahoma Department of Transportation. Materials and Research Division. Office of Research & Implementation | |
| dc.creator | Pourkhosrow, Ghasem | |
| dc.date.accessioned | 2018-12-05T16:30:36Z | |
| dc.date.available | 2018-12-05T16:30:36Z | |
| dc.date.issued | 1982-10 | |
| dc.description.abstract | The objective of this report is to evaluate the feasibilitly and benefit of utilizing asphalt pavement hot recycling in Oklahoma. The work began in April, 1980 and lasted through June 1980. The 8 1/2 mile (13.6 km) project was located on I-40 in Caddo County. The project involved cold milling the top one inch (25 mm) of roadway. A non-woven polypropylene fabric, Petromat, was placed on the cold milled surface. This material was overlaid with 1 1/2 inches (38 mm) of the hot recycled mixture containing recycled asphalt concrete, virgin aggregate, and asphalt cement. | |
| dc.description.peerreview | No | |
| dc.description.version | Final Report | |
| dc.format.extent | 45 pages | |
| dc.format.extent | 8,918,679 bytes | |
| dc.format.medium | application.pdf | |
| dc.identifier.govdoc | FHWA-OK-82-4 | |
| dc.identifier.other | Oklahoma Department of Transportation State Planning and Research Item Number 405 | |
| dc.identifier.uri | https://hdl.handle.net/11244/316255 | |
| dc.language | en_US | |
| dc.relation.ispartofseries | No | |
| dc.relation.requires | Adobe Acrobat Reader | |
| dc.subject.keywords | Asphalt pavement | |
| dc.subject.keywords | Cold milling | |
| dc.subject.keywords | Fabric | |
| dc.subject.keywords | Recycled material | |
| dc.title | Hot recycling of asphalt pavement (FHWA-OK-82-4) 405 | |
| dc.type | Technical Report | |
| dc.type.material | text |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- FHWA-OK-82-4 Hot recycling of asphalt pavement.pdf
- Size:
- 8.51 MB
- Format:
- Adobe Portable Document Format