Slurry seal crack treatment

Abstract

In the spring of 1975 the resurfacing project 1-35-3(88)126 was started. The experimental part of the project consisted of the use of an asphalt slurry to fill and seal cracks and spalls in the existing pavement, followed with a 1 and 1/2" type C asphalt concrete overlay and a 3/4" Open Graded Friction Course. The project was completed in the sunimer of 1975 with what appeared to be an excellent job.

Description

Keywords

Citation

Related file

Notes

Endorsement

Review

Supplemented By

Referenced By

DOI

Collection Detail

# of Isolates from RBM

# of Isolates from TV8